Live Every morning at 4 a.m.

Parts that will run out mid-job, caught weeks ahead.

Shortage Watcher

Every night at 4, it works through your open work orders and their parts lists against stock and inbound orders, 60 days forward, and drafts an expedite purchase order — or names alternates — for every part that comes up short. Purchasing reviews every draft.

Like every Infinary agent, it drafts — a person on your team approves before anything is posted.

What it does

The Shortage Watcher projects component demand 60 days out: every open and planned work order, exploded through its bill of materials to required parts and dates, compared against current stock plus inbound purchase orders. Every component that goes negative inside the horizon is a line-stop risk and gets a drafted recovery action — an expedite purchase order where the item has a clear supplier, otherwise a to-do naming possible alternates from the item master. Every projected shortage shows its arithmetic and cites the work orders, parts lists, and stock figures behind it. A component it cannot read is treated as a potential risk, never as available.

The facts on Shortage Watcher
Status
Live
Runs
Every morning at 4 a.m.
Cost per run
Up to $3
Review
Creates drafts only — you approve before anything is posted.Pauses for your sign-off before it writes anything.
What it reads
your existing reports, your records, live totals and history

The Problem Today

"Lines stop over five-dollar parts. The casing and the boards got ordered; the gasket with the three-week lead time didn't — and the miss surfaces the morning production needs it."

How Infinary Handles It

Every part of every scheduled job is checked against reality every night, weeks ahead. The gap becomes a drafted order with its arithmetic attached while normal shipping can still solve it.

What a run looks like

What a run looks like

Say a 500-unit production run is scheduled and the buyer covered the casings and boards — but a specialized gasket with a three-week lead time slipped through. Eighteen days out, the nightly run projects the gasket hitting zero on day four of production and drafts the expedite order, flagging a certified alternate supplier from the item master.

Purchasing opens the draft in the morning, checks the arithmetic against the cited work orders, and places the order with time to spare. The line runs because a person acted early — on a warning that did the math.

INF-SCENARIO-TRACE // shortage-watcher Infinary Supply Chain
Parts that will run out mid-job, caught weeks ahead.

Shortage Watcher

DEPLOYED IN CLIENT PRIVATE CLOUD
DATA_RESIDENCY: SOVEREIGN REVIEW: HUMAN_APPROVED
Example Scenario SHORTAGE-WATCHER-SCENARIO-01

How It Works

Step
By Step

01

Read

It reads open work orders, their parts lists, current stock, and inbound purchase orders.

02

Analyze

It projects each component's balance 60 days forward and flags everything that goes negative.

03

Draft

It drafts an expedite purchase order — or names alternates — for each shortage, arithmetic shown.

04

You approve

Purchasing reviews each draft and decides what, and from whom, to order.

What Changes

What You Get

Coverage Every scheduled job, nightly

All open work orders are re-checked against stock and inbound orders each night, 60 days out.

Trail Arithmetic shown

Every projected shortage cites the work orders, parts lists, and stock counts behind it.

Caution Risk, not assumed

A part it cannot read is flagged as a risk — never counted as available.

Put Shortage Watcher
to work in your own cloud.

How this actually runs